Crane collapsed at SUKE Expressway project in Malaysia
Feb 26 – A crawler crane collapsed at a construction site of the SUKE Expressway project along the Middle Ring Road 2 (MRR2) at about 9 am in the morning, … Read more
The Sungai Besi-Ulu Kelang Elevated Expressway (SUKE) is a 24.4 km, 3-lane, dual carriageway expressway that will commence at Sri Petaling and passes through Sungai Besi, Alam Damai, Cheras-Kajang, Taman Bukit Permai, Taman Putra, Taman Permai Jaya, Taman Dagang Permai, Taman Kosas, Ampang dan Taman Hillview before exiting at Ulu Kelang. The proposed expressway will serve as a link between existing major highways and road – MRR II, DUKE, AKLEH, KLORR, Sungai Besi extension, KL-Seremban, Cheras-Kajang, Besraya, KESAS and Jalan Ampang.
The project has been handled by Projek Lintasan Kota Holdings (Prolintas).
Feb 26 – A crawler crane collapsed at a construction site of the SUKE Expressway project along the Middle Ring Road 2 (MRR2) at about 9 am in the morning, … Read more