Seaway 7 Reports Damage to Alfa Lift A-frame in Shipyard
It was reported on the afternoon of the 18th of October that an incident involving the folding A-frame on the main crane of Alfa Lift which is currently under construction … Read more
It was reported on the afternoon of the 18th of October that an incident involving the folding A-frame on the main crane of Alfa Lift which is currently under construction … Read more
Another milestone has been reached for the OOS Walcheren with the 2,200 metric ton Offshore Mast Crane with reeved crane wires installed onboard. Using a 3,000 metric ton dual hook … Read more