Grove upgrades the GMK6400-1 to GMK6450-1

grove upgrades gmk6400 1 to gmk6450 1 01
  • Grove responded to customer demand for a higher-capacity crane by introducing the Grove GMK6450-1.
  • The updated nomenclature aligns with customer feedback and more accurately highlights the crane’s superior lifting capabilities in the six-axle category.
  • The nominal maximum capacity rating increases from 400 t to 450 t.

The Grove GMK6400-1 will be upgraded to the GMK6450-1 and carry an increased maximum capacity rating of 450 t, which is 50 t more than the previous GMK6400-1. The crane remains the strongest all-terrain crane available on six-axles and renaming it better reflects its true capabilities.

“Over the past two years, we have seen a growing demand for a name change from our global customer base. We reviewed the crane’s performance, which resulted in a new model, the GMK6450-1,” explained Andreas Cremer, Vice President Product and Project Management for Mobile Cranes at Manitowoc.

The addition of the MAXbase™ variable outrigger positioning system on the GMK6400-1 in 2021 allowed customers to further capitalize on the all-terrain crane’s strong performance. This feature allows the use of asymmetrical outrigger setups and results in enhanced load charts. In addition, MAXbase™ can be used in conjunction with the capacity-increasing MegaWingLift™. The self-rigging attachment can be deployed in less than 20 minutes and does not require an assist crane. MAXbase™ increases lifting capacity by up to 70% on the main boom and by up to 400% when using the luffing jib. These enhancements led to customer requests for renaming the crane.

The Grove GMK6450-1 offers segment-leading lifting capabilities and has been used on projects in place of seven-axle – or even eight-axle – all-terrain cranes. For example, it can lift 8.9 t between 38 m and 50 m radii when working with its full boom and jib system length of 136 m. When working with 120 m of boom and jib, the crane handles an impressive 12.8 t at distances between 36 m and 52 m. Furthermore, the GMK6450-1 is particularly well suited to wind power projects that require flexible set-up distances to the turbine and the ability to lift heavy loads at steep vertical angles. It can lift in wind speeds of up to 9 m/s with its 79 m luffing jib.

grove upgrades gmk6400 1 to gmk6450 1 02

1 thought on “Grove upgrades the GMK6400-1 to GMK6450-1”

Leave a Comment

Related Topics

Read More

h40 catalog en
The Saez H-40 is a game-changer in self-erecting tower cranes. With 4-tonne lifting capacity, 40m reach, and hydraulic setup from the ground, it’s perfect for mid-rise and tight-site projects. Discover its full specs and advantages.
jms risi ltm1100 5 3 handover switzerland 3
JMS RISI makes a bold move with the first LTM 1100-5.3 in Switzerland, deepening their partnership with Liebherr. Here's what that means for the future of Swiss construction.
tadano ac 6300 allen crane hire
Allen Crane Hire expands its fleet with the Tadano AC 6.300-1, a high-capacity, compact crane ideal for the tight spaces and tower crane work across Ireland.
terex ctl702 32 luffing jib crane 2025 1
Terex introduces the CTL 702-32, a 32t luffing jib crane designed for smarter, faster, and safer operation—featuring a 70m jib, slack rope system, and torque-controlled slewing.
wolff 8038 smart jib assembly crane 5
Wolffkran debuts its most powerful flat top crane yet—the 8038 Clear. With a 20t capacity and 85m reach, it’s built for modern modular construction and fast assembly.
liebherr ltm1120 4 2 crane bauma2025
Liebherr reveals the LTM 1120-4.2 at bauma 2025—a smart evolution of its 120t mobile crane featuring Liccon3 controls, touchscreen tech, and operator-focused updates.
sany sac1200e all terrain crane bauma2025
At bauma 2025, SANY presents the SCC2000A-EV electric crawler crane, SAC1200E all-terrain, SRE450N rough-terrain crane, and the SPL210 power pack—tailored for the DACH region’s emission-free future.
Liebherr Unveils 300-Tonne LR 1300.2 SX Unplugged Electric Crawler Crane at bauma 2025
Liebherr will debut the LR 1300.2 SX Unplugged at bauma 2025—a 300-tonne electric crawler crane with a 392 kWh battery, 196 m system length, and floating mode capability for clean, high-capacity lifting.
The GMK5150XLe
Manitowoc introduces the Grove GMK5150L-1e and GMK5150XLe—hybrid All Terrain cranes offering up to 20 hours of zero-emission lifting with no performance compromise. Launching at bauma 2025.
Raimondi Launches 24-Tonne T577 Flat Top Tower Crane—Its Largest Model to Date
Raimondi has launched the T577, a 24-tonne flat top tower crane with a max jib of 82.8 m and advanced controls. Debuted in Riyadh, it's the largest model in the company’s history.
manitowoc to showcase exciting new products and comprehensive product lifecycle support at bauma 2025 01
Manitowoc’s booth at bauma 2025 will feature hybrid-electric cranes, smart diagnostics, and a full suite of lifecycle services. With 12 cranes on display, the company showcases its vision for a more efficient, connected, and sustainable future in lifting.
manitowocs comprehensive array of aftermarket services on show at bauma 01
At bauma 2025, Manitowoc will dedicate a major part of its 3,300 m² booth to aftermarket services for Potain and Grove cranes. From genuine parts and remanufacturing to live demos of CONNECT™ platforms and training programs, visitors will get a comprehensive look at how Manitowoc enhances crane performance across the entire lifecycle.
crane counterweight configurations explained
Delve into the mechanics of crane counterweights, their configurations in various crane types, and real-world applications highlighting their importance in ensuring stability and safety.
luffing jib crane types uses
Luffing jib cranes are designed for confined job sites with limited swing radius. Here's when to use them—and how they differ across tower, crawler, and mobile crane applications.
pazola expands fleet liebherr ltm 1300 6 3
Pazoła strengthens its crane fleet with the Liebherr LTM 1300-6.3, featuring a 90m boom for superior lifting capacity in demanding industries like wind energy and construction.
702632 around 11 am on december 12, near jianghua community in the
A fatal crane collapse during a water tower demolition in Chengdu claimed the life of a worker, just days before his 29th birthday. Authorities are investigating safety lapses, with two individuals detained.
Item added to cart.
0 items - $0.00