3 ESTA Awards for Wagenborg Nedlift
During the annual presentation of the ESTA Awards on 17th March, Wagenborg Nedlift won awards in 3 categories. Category up to 120 tons lifting capacity: The replacement of the ‘Ludwig-Volk-Steg’ … Read more
During the annual presentation of the ESTA Awards on 17th March, Wagenborg Nedlift won awards in 3 categories. Category up to 120 tons lifting capacity: The replacement of the ‘Ludwig-Volk-Steg’ … Read more
Sarens’ client, Besix-Orascom Joint Venture (BOJV), is responsible for building the new Grand Egyptian Museum in Cairo and as part of the project had to install two ancient solar boats … Read more
Built at Zamil Shipyard in the port of Dammam, two floating drydocks, intended for maintenance and repair works of naval crafts in Saudi Arabia, are being commissioned by Constructions Mécaniques … Read more
In early July, three 168-tonne, 58-metre long steel girders were installed over the River Lippe using two units of 500-tonne mobile crane. This was to replace the bridge over the … Read more
ALE has completed a first record-breaking lift for the construction of a La Luna Hotel in Baku, Azerbaijan. The huge, curved steel bridge, weighing 2,100 tonnes was installed between the … Read more